madeo office - new floor (Backend Developers)

Our level lowered but this time we are totally fine with it. To the current sixth and fifth floor we acquired the fourth building level and so our dev team saves at least one minute a day thanks to shorter elevator rides.

https://www.madeo.com/careers

More by Pavel Novák

View profile